Research Guidance
Student Research guidance – Doctoral Degrees (dissertations)
S.No. |
Name of the Student |
Year of Completion |
Title of Thesis |
Supervisors |
1 |
K. Suryaprakasa Rao (Self) |
1988 |
On Interruptions, Optimal configurations and Productivity in a complex production system – Some computer simulation models |
Prof. K.N. Krishnaswamy & Prof. B.G. Raghavendra (IISc) |
2 |
B.V. Chowdary |
1997 |
Flexibility and related issues in the evaluation and selection of manufacturing systems |
Prof. K. S. P. Rao and Prof. Arun kanda (IIT-D) |
3 |
T. Ramesh Babu |
2005 |
Some issues in the design, operation and evaluation of production line systems |
Prof. K. S. P. Rao |
4 |
C. Senthilkumar |
2005 |
New approaches in Reliability analysis of nuclear safety systems |
Prof. K. S. P. Rao and Dr. Ompal Singh (IGCAR) |
5 |
R. Raja |
2005 |
Performance modeling and evaluation of cotton spinning systems |
Prof. K. S. P. Rao |
6 |
S. Rajakarunakaran |
2007 |
Design and development of intelligent DSS for safety management in process industries |
Prof. K. S. P. Rao and Dr. G. Venkataratnam (CLRI) |
7 |
John Abraham Nelson |
2007 |
Optimization and Simulation in the management of continuous process plant operations of petroleum refinery |
Prof. K. S. P. Rao |
8 |
K. Duraivelu |
2007 |
Modeling and analysis of product quality gaps across product life cycle |
Prof. K. S. P. Rao |
9 |
R. Saravanan |
2007 |
An empirical investigation of total quality service in Indian automobile sector |
Prof. K. S. P. Rao |
10 |
A. John Rajan |
2007 |
Decision making models with composite scales for customer integrated vendor evaluation |
Prof. K. S. P. Rao |
11 |
P. Chandiran |
2008 |
Design and evaluation of integrated supply chain facility networks |
Prof. K. S. P. Rao |
12 |
S. Prasanna Devi |
2011 |
A Study on Improving Certain Pre-Transplantation Decision Issues Related To Kidney and Corneal Transplantation Programs |
Prof. K. S. P. Rao |
13 |
C.Venugopal |
2011 |
Investigation into implementation issues of ERP systems |
Prof. K. S. P. Rao |
14 |
P. Rajkumar |
2012 |
An empirical study on impact of emerging organised urban agro retailers on traditional vegetable retail |
Prof. K. S. P. Rao |
15 |
S.Krishnakumar |
2013 |
Entrepreneurial orientation for employees and its effects in organizations |
Prof. K. S. P. Rao and Dr.Magesh |
16 |
Jedsada Tipmontian |
2014 |
Risk Modelling of Agro-Industrial Supply Chains in Asian Countries |
Prof. K. S. P. Rao and Dr. M.Rajmohan |
17 |
Gunaselvi Manohar |
2016 |
Integration of On-Board Diagnostics with System Dynamics to Study Road Transport Pollution |
Prof. K. S. P. Rao and Dr.Dillibabu |
18 |
A. Paramasivam |
2019 |
Investigation of performance evaluation of Reconfigurable discrete manufacturing systems – some simulation experiments |
Prof. K. S. P. Rao and Dr. M.Rajmohan |
19 |
M. Sivasundari |
2020 |
Production planning for large scale Engineering Industry - A generic approach |
Prof. K. S. P. Rao and Dr.Raju |
Sampling of M.E. / M.S. Projects guided:
S.No. |
Name of Student |
Year of Completion |
Title of Thesis |
1 |
Ms.S. Sankaralakshmi |
2012 |
Multi-Disciplinary optimization of product development process in an automobile industry |
2 |
Mr. B. Gopinath |
2011 |
Simulation Study of Reconfigurable Assembly Line - A Case Study |
3 |
Mr. Samy Raja |
2011 |
Kidney transplantation: e-DSS for improving matching efficiency in kidney pair donations |
4 |
Mr. R. Saravana Kumar |
2010 |
Evaluation of Kidney Transplantation Programmes Using System Simulation |
5 |
Ms. P. Vimala Devi |
2010 |
A Study on Issues Related to Organ Transplantation and Allocation Network |
6 |
Mr. R. Vijay |
2010 |
A Study on Manufacturing Lead Time in an Automobile Auxiliary Unit |
7 |
Mr. S. Raj Kumar |
2010 |
Intelligent Assessment of Quality Performance For E-Banking Security Using Fuzzy Logic |
8 |
Ms. S. Sai Sangeetha |
2009 |
Using Artificial Neural Networks to forecast the Duration of Surgery Time |
9 |
Ms. Gunaselvi Manohar |
2009 |
Application of value Engineering in an Instrumentation Industry |
10 |
Ms. R. Subha |
2009 |
DSS for the selection of ERP Package |
11 |
Ms. S. Vanathi |
2008 |
Dynamic Modeling of the Software Implementation Process |
12 |
Ms. P. Vijayalakshmi |
2008 |
A Study on Optimal Mixing of Cotton varieties in a Cotton Spinning System |
13 |
Mr. B. Sivakrishna |
2007 |
Human Reliability Analysis in Probabilistic Safety Assessment of Nuclear Power Plants |
14 |
Ms. K. Sowjanya |
2007 |
A Study on Various Approaches to Detect and Avoid Dead locks in FMS |
15 |
Ms. S. Prasanna Devi |
2007 |
Decision Support System For Supplier Selection In a Supply Chain Management: an Operations Research Approach |
16 |
Mr. S. Naveen Kumar |
2007 |
Performance Evaluation of Integrated Supply Chain Network |
17 |
Mr. C. Raveendra Baskar |
2006 |
A Study on Safety management Issues in Process Industries |
18 |
Mr. E. Jeevanantham |
2006 |
Assignment and Sequencing of Job Orders in an Engineering Industry |
19 |
Mr. John Dilip Raj |
2006 |
Productivity Management model for a Service Sector Organization |
20 |
Ms. Mamata |
2005 |
Decision Support System for Safety management in Process Industry |
21 |
Mr. N. Subramani |
2004 |
Integration of Forward and reverse Supply Chain / Logistics - A Case Study |
22 |
Mr. Syed Ismail Faizen B |
2004 |
Application of Constraint Programming for Cutting Stock Problem |
23 |
Mr. Sateesh N |
2004 |
Study and Analysis of Production Planning in an Assembly Line |
24 |
Mr. K.S. Jaya Raman |
2004 |
Role of Kanban in Improving manufacturing System Performance - A Case Study |
25 |
Mr. N.S. Arun Raj |
2002 |
A Decision Support System for Multi Objective Optimization in Cotton Mixing |
26 |
Mr. S. Velmurugan |
2002 |
A Study on Inventory Control System in Automobile Industry |
27 |
Mr A. Paramasivam |
2002 |
Design of Facility Layout and Material Handling System in An Automobile Industry |
28 |
Mr. B.C. Rajesh Kumar |
2002 |
Evaluation of Inventory related Policies at two different Levels of Supply Chain Network |
28 |
Mr. K. Rajavardjana Reddy |
2001 |
Evaluation of alternative maintenance policies through Computer Simulation |
29 |
Mr. K. Ramanathan |
2001 |
A System Study to minimize Energy Consumption in a Sugar Mill |
30 |
Ms. S. Rajarajeswari |
2001 |
Performance Modeling of Cotton Spinning System A Case Study |
31 |
Mr. Suresh Seetha |
2000 |
Multiple Objective Decision Modeling For Capacity Loading Problem at Nelcast - A Goal Programming Approach |
Categories
- Home
- Personal
- Education
- Experience
- Courses Taught
- Awards
- Research Guidance
- Publications
- Others